Innovative Development Program

The purpose of the Innovative Development Program of the Company (hereinafter referred to as “the Program”) is a transition to electric grids of a new technological mode with qualitatively new characteristics of reliability, efficiency, accessibility, manageability and customer centricity of the power grid complex.

The objectives of the Program are:

  • achievement of the required levels of reliability, safety, quality, efficiency and accessibility of energy supply of customers by implementing new equipment, technologies and practices;
  • enhancement of the Company customer-oriented approach by improving the existing ones and creating new services including high-tech ones;
  • development, approbation and provision of conditions for serial implementation of innovative equipment and practices with account of comprehensive efficiency factors and on the basis of management principles of the life-cycle of objects and systems;
  • improvement of the system of interaction with the subjects of the sectoral innovative ecosystem, i.e. small and medium-sized businesses, universities, research organizations, the leading domestic and foreign equipment manufacturers etc.;
  • improvement of the innovation governance system and creation of the intellectual property management system;
  • improvement of the Company operating efficiency on a new technological and methodological base;
  • creation of personnel capacity with perspective competencies in order to ensure objectives of the Company innovative development;
  • creation of conditions for the development of perspective scientific research, technological work;
  • reduction of the negative impact of the power grid complex facilities on the environment.

In the reporting year the Company implemented the Program approved by the Board of Directors (Minutes No. 115/2011 of 7/29/2011 as amended on 6/18/2012, Minutes No. 137/2012).

In the reporting year the following measures on the key areas of the Company innovative development were taken:

Key areas of the Innovative Development Program of the Company

Measures taken

A transition to digital substations of different voltage classes of 35–110 (220) kV

Design and survey works were performed within the project of “Reconstruction of 110 kV Tuapse-City SS” with the equipment with a digital substation system in terms of relay protection and automatic equipment, information collection and transmission system

A transition to digital active-adaptive grids with the distributed intelligent automation and management system

Completed:

  • “Implementation of intelligent electricity meters as part of the automated electric power metering system on problematic feeders at a voltage level of 0.4 kV (0.23 kV)” was introduced, 2,148 metering devices were mounted;
  • design and survey works on “Introduction of APCS on the basis of digital devices during the construction of 220 kV Port SS”;
  • five production samples of domestic electric charging stations for electric vehicles, FORA ECS-AC, were installed in Sochi Electric Grids branch.

A transition to comprehensive efficiency of business processes and automation of management systems

Completed:

  • development of the Production Assets Management System (PAMS) in terms of the expansion of its functional capability;
  • expansion of the functionality of the Personal Account of the Customer on the official website of Kubanenergo PJSC

The application of new technologies and materials in electric power industry

Completed:

  • design and survey works on facilities of the following pilot project: “Introduction of innovative 0.95 kV electric grid” and “Introduction of poles made of composite materials”;
  • introduction of innovative solutions: 6–10, 35 kV vacuum circuit breakers, local backup protection of power-transformer protection, equipment for partial discharge monitoring of power transformers insulation, digital devices of relay protection and automation supporting digital data exchange according to Protocol No. 61850 of the International Electrotechnical Commission, high-temperature wire;
  • design and survey works on the activity “Implementation of intelligent systems for monitoring and diagnostics of 110 kV CL performance in the process of construction of 2 Dzhemete-Pionerskaya CL of 110 kV with the installation of 110 kV cells at 110 kV Dzhemete SS”;
  • design and survey works involving the implementation of innovative solutions

Development of the system of elaboration and implementation of innovative production and technologies

The R&D program of the Company was performed in accordance with the concluded agreements

Development of human resources and partnership in the field of education

650 students received practical training in the Company, 38 employees of the Company were retrained in institutions of higher education

Performance indicators of the Company innovative activity in 2016, RUB thou excluding VAT:

Expenses for R&D carried out by third-party organizations, including by contractors (institutions of higher education, scientific organizations, innovative companies of small and medium-sized business)

11,166.5

of which with regard to projects implemented within

  • technology platforms
  • Institutions of higher education

2,200.0

  • scientific organizations

8,966.5

Expenses for procurement of innovative production (technologies, solutions, goods, works, services determined by the approved Innovative Development Program of the Company)

396,090