Volumes of consumer demand for technological connection in 2018
In 2018 The Company concluded 28,083 contracts for technological connection to the power grids of Kubanenergo PJSC for a total capacity of 1,091 MW with a total cost of 2.888 billion rubles, excluding VAT.
| Class of customer | The number of contracts for technological connection | |
|---|---|---|
| number | for a total power, MW | |
| Up to 15 kW inclusive, total | 26,140 | 310 |
| including individuals up to 15 kW inclusive | 21,889 | 261 |
| Over 15 and up to 150 kW inclusively | 1,325 | 77 |
| Over 150 kW and less than 670 kW | 277 | 74 |
| Not less than 670 kW | 256 | 593 |
| Power generation facilities | 3 | 36 |
| Total, excluding temporary technological connection | 28,001 | 1,090 |
| Emporary technological connection | 82 | 1 |
| Total, with account for the temporary technological connection | 28,083 | 1,091 |